        Detailed low-voltage electrical engineering steps
        Date:[2011-12-10 14:16:46]
        For one project, in order to complete the steps it must go through a lot, let's first look at the steps to complete the project and the specific content of the work every step: The first step: the correct understanding of the user's design requirements, preparation of technical protocols This is an engineering process, and users should communicate more fully understand the requirements of users, and users from a professional point of view to give some suggestions; the real understanding of the user's requirements, these elements are included in the technical agreement in the Technical Agreement It normally contains the technical part of the business part and Commerce from the commercial point of view some of the major clear and user rights and obligations between, for example: the price is and how the payment, warranty period is long, what breach of contract penalties; and technical part of the main technical point of view clear from the product itself to provide the product or service specifications, scope, etc. We introduce here the main part of the agreement leakage circuit breaker technology, the preparation, which is part of the general business agreement as an annex to the contract being present in the generally include the following components: equipment specifications, models, the appearance of size, performance standards, equipment, packaging, paint, etc. Step Two: Draw a schematic diagram in accordance with the technical requirements of the agreement, complete system schematic design, If the user provides a schematic, you can omit this step Step 3: Select the components required according to the load line to determine the parts list schematic is complete, the system can determine the types of components that will be used; according to system load line requirements can calculate the components of the load size, according to the load size and Selection Guide can determine the specific brand and model components, the component model to write the list of components Step 4: Dimension drawing components based on component installation drawings and layout components of the shape parameters can also be small circuit breakers to be found in the manual selection, according to these parameters, we can complete the system installation drawings and layout Fifth step: Figure installation, wiring devices in accordance with design drawings will be installed to control cabinet and wiring work to complete Step 6: Write debugging manual, manual according to the finished product debug write debugging information technology protocol manual debugging process must include all components and all of the functions; then programmed Commissioning Manual in accordance with debugging products, and complete debug logs. Step 7: All technical documents filed in the project design drawings, component lists, inspection reports, product certification, instruction manual, commissioning records and other documents organized into books, on the transfer of equipment available to the user.
        亚洲日本成本人观看-99精品视频九九精品视频-国产乱人视频在线播放-天天怕夜夜怕狠狠怕

          <strike id="zbqg0"></strike>
          1. <th id="zbqg0"></th>